Production failure lab · ETO-15
A trace shows a required lookup was skipped. The lookup ran.
Level: PRODUCTION · About 25 minutes · Track: Agents Tools
The weekly contract-compliance report says 38 of 400 ORDER_STATUS turns answered without calling lookup_order.
You have read three incidents that produce exactly this. One was a tool missing from the registry. One was an instruction removed from a prompt. One was a model declining a request it was never required to obey.
ORD-8802 is one of the 38. The trace has three spans and no tool call.
Read it anyway, before you decide which of the three this is.